Prague, External Prague ring road, 514 Slivenec - Lahovice
This mentioned part will be one of the sections in the prepared south-western Prague ring road between highways D1 and D5.
Information:
Location: | Prague |
---|---|
Investor: | Ředitelství silnic a dálnic ČR |
Realization: | Joint-venture of companies STRABAG a.s., HOCHTIEF Construction AG, Max Bögl a Josef Krýsl, kom. spol. |
Type: | New construction |
Construction time: | 2006 - 2010 |
Main indicators: | |
Description: | The ring route will include a steel bridge over the Lochkovské Valley – behind the Radotín cement factory, two parallel tunnel tubes with the length of 1.5 km – three-lane ascending and two lane descending, a two kilometer long flyover bridge over the Berounka Valley and a large interchange crossroad with Strakonická slip road. |